Efficient and Safe Site Management is Possible with Meissa Platform's Features.

Implement a more efficient and faster site management process through analysis features such as site monitoring, drawing comparison, and earthwork volume measurement.

Use of Construction Site Data

What Will the Site Look Like After the Introduction of the Meissa Platform?

Experience Fast and Efficient Construction Site Management with Meissa's Various Functions that Utilize the Collected Field Data.

01

Access the Latest Site Maps Anytime, Anywhere

Check Site Changes and Progress by Date Right Away, Anytime, Anywhere.

02

Intuitive Drawing Comparison and Progress Tracking

Compare Whether the Construction Status at Our Site Is Progressing According to Drawings and Plans.

03

Earthwork Volume Measurement with Just a Few Clicks

Cost and Time Reduced by 90%, cm-Unit Error Accurate On-Site Testing Is Possible.

04

Site Communication and Safety Monitoring

My Team Is Safer with Real-Time Location Sharing and Issue Communication! Hazardous Areas on the Field Map at a Glance!

01. On-Site Remote Monitoring

Monitor and share site changes remotely.

Remotely monitor the work site with 2D maps, 3D models, 360 panoramas, and videos on a single platform, and promptly check daily site changes and progress.

2D/3D Monitoring

You Can Monitor the Latest Site Appearance at a Glance in 2D and 3D and Check the Site Situation Conveniently and Intuitively Remotely.

Panorama and CCTV

You Can Easily Upload and Play Drone 360 Panoramic Video and CCTV Footage Remotely. Monitor the Situation Throughout the Site Through Video.

Change Management

Compare Changes at the Same Location at Different Points in Time Using a Two-Segment Slide Comparison Method and Understand the Process Progress.

현장 변화 데이터 관리

드론으로 수집/분석한 현장 데이터는 자동으로 저장됩니다. 사고, 분쟁 발생시 현장 데이터를 열람하고 확인해보세요!

02. On-Site Construction Management

Is the Construction Status at Our Site Progressing as Planned Compared to the Drawings?

Using the Drawing Overlay Function (2D CAD, 3D BIM Drawings), We Can Compare Design Planning and Construction Status and Track Progress. Understand It Efficiently.

Construction Drawing Overlay

Compare Drawings and Sites Based on Accurate Coordinate Information. Quick Confirmation Is Possible When Design-On-Site Errors Occur.

BIM Matching

View BIM Files Within the Platform and Match Them With the Drone 3D Model. It Is Possible to Establish and Review Site Plans and Intuitively Check Structure Location Errors.

Checking Cadastral Map

Check Parcel Information Immediately by Comparing 2D Orthophotos and Cadastral Maps. Check the Construction Zone Parcel to Immediately Determine Whether Compensation Is Due and Identify Civil Complaints and Dispute Areas in Advance.

03. On-Site Earthwork Volume Measurement

Check Accurate Survey Results with a Few Mouse Clicks.

Existing Survey Work That Takes About 4 Hours for 100 ha Can Be Confirmed With Just a Few Clicks on the Meissa Platform.

Create Cross-Sectional View

If You Create a Cross-Sectional View Creation Line on the Latest Map of Our Site, You Can Compare the Cross-Section Information of the Section With the Plan Height. Check Construction Progress and Errors in Real Time.

Earthwork Volume Calculation

The Meissa Platform Allows You to Automatically Calculate Earthwork Volume With Just a Few Clicks by Comparing the Site Surface and Planned Height. Use It to Check Monthly Earthwork Progress and Estimate Volume.

Earthwork Volume Summary

By Comparing the Current Height and Planned Height Based on District Drawings, the Remaining Work Volume Can Be Calculated by Stratum. Check the Status of Quantity Progress, Which Was Difficult to Manage by Date, Easily and Quickly.

04. On-Site Communication, Safety Monitoring

Communicate and Manage Safety on the Latest Map of Field Situations with Many Accidents.

The Meissa Platform Immediately Records Tasks/Actions on My Latest Site Map and Provides Web and Mobile Apps. You Can Communicate Quickly Through Them. In Addition, Remote Site Safety Management Is Also Possible as On-Site Risk Zone Setting and Location Tracking Are Possible Through the Meissa Guard App.

Work and Issue Management

When an Issue Occurs, Record the Issue/Action Immediately on the Site Map. Intuitive Communication Is Possible Through Mobile Apps in Real Time With Field-Related Entities. You Can Record Changes and Attach Various Files by Taking Pictures or Leaving Comments With Your Mobile Device.

Manpower and Vehicle Control

Check Real-Time Location Information of Personnel/Equipment on the Latest Map of Our Site.

Hazardous Area Management

Are There Any Dangerous Areas on Site Where an Accident Could Occur? Don't Worry. You Can Prevent Accidents in Advance by Setting Up Dangerous Zones Using the Maysa Platform and Notifying the Person in Charge When a Worker Enters the Dangerous Zone.

Q&A

Frequently Asked Questions

The First Step to Smart Construction, the Meissa Platform. Ask Meissa Any Time.

How Are the BIM Model and 3D Model Matched to the Exact Location?

Coordinate Information of the BIM Model and 1:1 Scale Coordinate Information of Meissa's 3D Model Makes This Possible.

Icon - Elements Webflow Library - BRIX Templates

How Is Spatial Information Data Included in an Orthophoto (Map)?

The File Structure of an Orthophoto Is GeoTIFF, and This Is Possible Because the File Structure Includes Coordinate System Data and Is Stored Along With the Photo.

Icon - Elements Webflow Library - BRIX Templates

How Are Drawings and Orthophotos (Maps) Matched to the Exact Location?

This Is Possible by Matching the Coordinate Information of the Drawing With the Coordinate Information of Meissa's Orthophoto Made at 1:1 Scale.

Icon - Elements Webflow Library - BRIX Templates

What Is the Error Value When Measuring Earthwork Volume?

It Is Fast and Based on Drone Spatial Data With an Error of Less Than 2cm on the x and y Axes and 6cm on the z Axis. Accurate On-Site Measurement Is Possible.

Icon - Elements Webflow Library - BRIX Templates

How Can I Further Reduce x, y, z Value Errors?

The Accuracy Increases as the Number of GCPs Per Site Is Secured to the Maximum. (1 GCP at Intervals of 300-500m Horizontally/Vertically). Additionally, the More Photos That Contain GCPs (At Least 4-5) and the More You Avoid Photos With Reflections, Repeated Patterns, or No Patterns at All, the Higher the Accuracy.

Icon - Elements Webflow Library - BRIX Templates
Use case

Construction Client Case Studies

How Are Meissa's Existing Customers Getting Started with Smart Construction?
Explore Through Meissa Platform Customer Cases.

Company-wide Introduction of DL E&C Meissa Platform

"After adopting the Meissa Platform, we easily manage risks across all sites."

DL E&C Convergence Technology Team
Introduction of KCC Construction Civil Engineering Site

"KCC Construction has optimized civil site management with Meissa."

KCC Construction Sejong-Anseong Expressway Section 5 Site
On-site Introduction of Xi C&A Production Facility

"At Xi C&A, we manage multi-channel data integrally with Meissa."

Xi C&A Ochang Energy Plant 2 Battery Production Building 2 Site
Learn More
Introduction of HDC Hyundai Development Company's Apartment Complex Housing Construction Site

"Through Meissa, HDC minimizes on-site process"

HDC Hyundai Development Company Residential Construction Site
Learn More
Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates
On-site Introduction Procedure

Introduction Process

Experience the Meissa Platform's Construction Site Digital Twin, Start Right Now.

Find a Plan Suitable for the Site

Price Calculation Depends on Site Area and Situation. It Varies. For Detailed Conditions and Quotations, Please Contact Us by Email or Phone.

Create a Account and Project

We Will Send a Project Participation Email to Your Registered Email Account. Start the Meissa Platform Right Away by Creating an On-site Project.

On-site Training, Introduction Completed

We Provide Flight Training and Platform Training Through Direct On-site Visits. Careful Training is Provided to Enable Autonomous Drone Flight in Just One Day, and a Guide Link is Also Provided.

Apply for a Demo of the Meissa Platform for an Easy and Fast Start to Smart Construction.