Efficient & Safe Site Management with Meissa

Optimize site management with powerful features like monitoring, drawing comparison, and earthwork volume measurement.

Use of Construction Site Data

Smarter, Safer, and More Efficient Site Management with Meissa

Experience Fast and Efficient Construction Site Management with Meissa's Various Functions that Utilize the Collected Field Data.

01

Access the Latest Site Maps Anytime

Track site changes and progress instantly, from anywhere.

02

Intuitive Drawing Comparison & Progress Tracking

Ensure construction aligns with plans through easy visual comparisons.

03

Earthwork Volume Measurement in Clicks

Reduce costs and time by 90% with precise cm-level accuracy.

04

Real-Time Communication & Safety Monitoring

Enhance team safety with live location sharing and instant issue alerts.

01. Remote Site Monitoring

Monitor and share site changes remotely.

Remotely monitor the work site with 2D maps, 3D models, 360 panoramas, and videos on a single platform, and promptly check daily site changes and progress.

2D/3D Site View

Instantly access the latest site visuals.

Panorama & CCTV

View and compare site conditions through video.

Change Tracking

Use side-by-side comparisons to track progress over time.

02. Construction Progress & Compliance

Ensure construction aligns with plans by overlaying CAD, BIM, and cadastral maps on real-time site data.

Using the Drawing Overlay Function (2D CAD, 3D BIM Drawings), We Can Compare Design Planning and Construction Status and Track Progress. Understand It Efficiently.

Drawing Overlay

Compare designs with actual site conditions.

BIM Matching

Align 3D models for structure accuracy.

Cadastral Mapping

Verify land parcels and resolve disputes easily.

03. Earthwork Volume Measurement

Get precise earthwork calculations in minutes, not hours.

Existing Survey Work That Takes About 4 Hours for 100 ha Can Be Confirmed With Just a Few Clicks on the Meissa Platform.

Cross-Section Analysis

Compare site elevation with planned heights.

Automated Volume Calculation

Instantly estimate remaining work.

Progress Tracking

Monitor daily and monthly excavation data.

04. Real-Time Communication & Safety Management

Enhance site collaboration and safety with instant issue tracking and geofencing.

The Meissa Platform Immediately Records Tasks/Actions on My Latest Site Map and Provides Web and Mobile Apps. You Can Communicate Quickly Through Them. In Addition, Remote Site Safety Management Is Also Possible as On-Site Risk Zone Setting and Location Tracking Are Possible Through the Meissa Guard App.

Task & Issue Management

Log and share updates in real time.

Personnel & Equipment Tracking

Monitor locations on live site maps.

Hazard Zone Alerts

Set danger zones and receive automatic warnings.

Q&A

Frequently Asked Questions

The First Step to Smart Construction, the Meissa Platform. Ask Meissa Any Time.

How Are the BIM Model and 3D Model Matched to the Exact Location?

Coordinate Information of the BIM Model and 1:1 Scale Coordinate Information of Meissa's 3D Model Makes This Possible.

Icon - Elements Webflow Library - BRIX Templates

How Is Spatial Information Data Included in an Orthophoto (Map)?

The File Structure of an Orthophoto Is GeoTIFF, and This Is Possible Because the File Structure Includes Coordinate System Data and Is Stored Along With the Photo.

Icon - Elements Webflow Library - BRIX Templates

How Are Drawings and Orthophotos (Maps) Matched to the Exact Location?

This Is Possible by Matching the Coordinate Information of the Drawing With the Coordinate Information of Meissa's Orthophoto Made at 1:1 Scale.

Icon - Elements Webflow Library - BRIX Templates

What Is the Error Value When Measuring Earthwork Volume?

It Is Fast and Based on Drone Spatial Data With an Error of Less Than 2cm on the x and y Axes and 6cm on the z Axis. Accurate On-Site Measurement Is Possible.

Icon - Elements Webflow Library - BRIX Templates

How Can I Further Reduce x, y, z Value Errors?

The Accuracy Increases as the Number of GCPs Per Site Is Secured to the Maximum. (1 GCP at Intervals of 300-500m Horizontally/Vertically). Additionally, the More Photos That Contain GCPs (At Least 4-5) and the More You Avoid Photos With Reflections, Repeated Patterns, or No Patterns at All, the Higher the Accuracy.

Icon - Elements Webflow Library - BRIX Templates
Use case

Construction Client Case Studies

How Are Meissa's Existing Customers Getting Started with Smart Construction?
Explore Through Meissa Platform Customer Cases.

Company-wide Introduction of DL E&C Meissa Platform

"After adopting the Meissa Platform, we easily manage risks across all sites."

DL E&C Convergence Technology Team
Introduction of KCC Construction Civil Engineering Site

"KCC Construction has optimized civil site management with Meissa."

KCC Construction Sejong-Anseong Expressway Section 5 Site
On-site Introduction of Xi C&A Production Facility

"At Xi C&A, we manage multi-channel data integrally with Meissa."

Xi C&A Ochang Energy Plant 2 Battery Production Building 2 Site
Learn More
Introduction of HDC Hyundai Development Company's Apartment Complex Housing Construction Site

"Through Meissa, HDC minimizes on-site process"

HDC Hyundai Development Company Residential Construction Site
Learn More
Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates
On-site Introduction Procedure

Implementing Our Solution

Experience digitalization the easy way.

Choose a Plan

Select the right plan for your site.

Create an Account

Sign up in minutes.

Get Started

Complete on-site training and start right away.

Smart Construction Made Easy! Request a Meissa Demo.